Conversation
…BND Fall Production
linyan-w
left a comment
There was a problem hiding this comment.
Validation in the linked docdb entry. Thanks a lot Justin!
|
trigger build LArSoft/lar*@LARSOFT_SUITE_v10_12_02 |
|
✔️ CI build for LArSoft Succeeded on slf7 for c14:prof -- details available through the CI dashboard |
|
✔️ CI build for LArSoft Succeeded on slf7 for e26:prof -- details available through the CI dashboard |
|
❌ CI build for SBND Failed at phase build SBND on slf7 for c14:prof -- details available through the CI dashboard 🚨 For more details about the failed phase, check the build SBND phase logs parent CI build details are available through the CI dashboard |
|
❌ CI build for ICARUS Failed at phase build ICARUS on slf7 for c14:prof -- details available through the CI dashboard 🚨 For more details about the failed phase, check the build ICARUS phase logs parent CI build details are available through the CI dashboard |
|
❌ CI build for ICARUS Failed at phase ci_tests ICARUS on slf7 for e26:prof - ignored warnings for build -- details available through the CI dashboard 🚨 For more details about the failed phase, check the ci_tests ICARUS phase logs parent CI build details are available through the CI dashboard |
|
🚨 For more details about the warning phase, check the ci_tests SBND phase logs parent CI build details are available through the CI dashboard |
…BND Fall Production
Description
Please provide a detailed description of the changes this pull request introduces. If available, also link to a docdb link where the issue/change have been presented on/discussed.
This PR updates the Supera hyper-parameters used for SBND to new values reflecting updates to the major simulation/reconstruction changes that have accumulated over the past several months. The study is documented here and was presented at an SBND Reconstruction Working Group meeting.
Resolves #601
This is intended for the SBND Fall Production. No backwards support for the SBND Spring Production is requested.